Before a design is priced, we walk the lot with the owner and record the slope, the soil, the trees that will stay, and the direction the weather comes from. Those notes become the first pages of the ledger. The story pole is then set at a fixed corner and every later measurement is taken from it, so the elevation of the slab, the top of the brick and the sill of the window all agree. When the excavation begins, the foundation crew and the masonry crew are already working to the same marks.
Coursing is the part of the work most owners never see and most problems trace back to. We do not let a bricklayer guess at a bond, and we do not let a wall run past the line to save a cut. Every pier is checked with a level in two directions, every course is checked against the ledger, and every head joint is filled before the next course covers it. The jointer wheel comes off the rack at the end of each lift, not at the end of the job.
The same discipline carries into the finishes. We schedule the rough trades so that no one is cutting a channel into fresh masonry, and we keep a weather eye on the forecast so that mortar is never laid into a freezing night or a driving rain. The result is a house that does not need to be explained away later.
If you are planning a home, an addition or a garden wall, the first conversation is free of charge. Bring the drawings you have, or bring only a list of what the family needs. We will tell you what the ground allows and what the budget will carry.
A note on how we price this work. Masonry is priced by the course and by the pier, not by the hour, because a wall that is paid by the hour rewards slowness. Concrete is priced by the cubic yard and by the finish, with the formwork and the reinforcement listed separately so an owner can see where the money goes. Framing and roofing are priced from the drawings once the structural engineer has signed them, and the supervision line is a fixed percentage of the work under our control. Every line on the estimate corresponds to a line on the course ledger, so an owner can follow a dollar through the job.
We also know that most families do not build a house twice. The principal takes time to explain the sequence, the inspections and the decisions that will be needed, and will draw a section on the back of a ledger sheet if that makes the point clearer than a paragraph. There is no charge for that explanation and no penalty for deciding to wait a season. A rushed start is the most expensive start there is.
Request a site walk Review the six services